Learn how to be notified of changes to this page.
You can find free electronic copies of plans and specs at Idaho Plan Room.
Idaho's Governor has issued an Executive Order 2006-40 that requires contracts for services performed in the State of Idaho are with businesses that employ individuals who are eligible under Federal and State law to work in the United States. The Division of Public Works is developing procedures to assure that this requirement is met.
| Submission Date |
Project Number |
Project Name |
| 10-16-08 | 06092 | HVAC Retrofit, Evergreen Bldg., College of Southern Idaho, Twin Falls, Idaho *NOTE NEW BID DATE* |
| 10-16-08 | 07208 REBID | ADA Toilet Modifications, Morrison Center, Boise State University, Boise, Idaho |
| 10-16-08 | 08256 | Patch & Overlay, Nez Perce Drive, University of Idaho, Moscow, Idaho |
| 10-21-08 | 08402 REBID | Replace Heat Pumps, Phase 2, PTF, SHS, Department of Heatlh & Welfare, Blackfoot, Idaho |
| 10-30-08 | 08300 | Office Remodel and New Basement Fire Sprinkler System, IAB, Department of Labor, Boise, Idaho |
No RFQs are available at this time.
No RFQs are available at this time.
Archived Bid Results: 2008, 2007, 2006, 2005, 2004, and 2003
| Submission Date |
Project Number |
Project Name |
Contractor |
Base Bid |
Alternates |
Awarded |
| 10-07-08 | 08230 | Renovate Research Labs, Life Science A, Idaho State University, Pocatello, Idaho | Barry Hayes Construction | $194,236 | 1. $32,791 | |
| Century Contractors | $210,266 | 1. $40,186 | ||||
| D.L. Beck, Inc. | $183,379 | 1. $39,565 | ||||
| Harris, Inc. | $191,000 | 1. $34,000 | ||||
| Rivers West Construction | $188,000 | 1. $35,000 | ||||
| SE/Z Construction | $212,943 | 1. $36,750 | ||||
| Vern Clark & Sons | $191,500 | 1. $36,900 | ||||
| Wright Brothers | $223,807 | 1. $36,912 | ||||
| DeWall Construction | $187,500 | 1. $33,100 | ||||
| 10-2-08 | 07335 | Improvements, Moscow RC, Moscow, Idaho | RMR Construction | $145,000 | 1. $87,500 2. $20,900 |
|
| Barclay Construction | $151,740 | 1. $82,820 2. $11,300 |
||||
| Kensaston Corporation | $188,900 | 1. $79,693 2. $17,569 |
||||
| Golis Construction | $153,400 | 1. $67,700 2. $12,800 |
||||
| 09-30-08 | 08244 | Overhaul Chiller/HVAC Upgrades, Leonard Hall, Idaho State University, Pocatello, Idaho | Lewis Corporation | $178,500 | ||
| B&S Boiler | $230,135 | |||||
| Intermech/Atlas | $129,920 | |||||
| Economy Heating & Refrigeration | $148,000 | |||||
| Bingham Mechanical | $164,000 | |||||
| 09-25-08 | 08068 | Replace Rooftop Units, PWCC, Department of Correction, Pocatello, Idaho | Lewis Corporation | $390,000 | ||
| Intermech | $417,395 | |||||
| 09-23-08 | 08340 | Site Preparation, Sandpoint RC, Division of Military, Sandpoint Idaho | Woods, Inc. | $84,122 | Unit Price $14.93 | |
| J. Foote Excavation | $153,718 | Unit Price $30.86 | ||||
| J.H. Landworks | $72,860 | Unit Price $2,100.00 | ||||
| 09-23-08 | 08546 | Replace Office Trailer, Lake Walcott State Park, Department of Parks and Recreation, Rupert, Idaho | Harris, Inc. | $380,000 | 1. $37,500 2. $2,600 |
|
| Wright Brothers Construction | $422,776 | 1. $47,135 2. $4,213 |
||||
| C-2 Construction | $347,963 | 1. $49,300 2. $6,800 |
||||
| Excelsior Construction | $345,000 | 1. $29,000 2. $2,200 |
||||
| Beniton Construction | $527,726 | 1. $42,841 2. $3,447 |
||||
| Barry Hayes Construction | $370,126 | 1. $29,316 2. $3,102 |
||||
| Century Contractors | $446,434 | 1. $33,000 2. $3,600 |
||||
| 09-23-08 | 08150 | Chiller Replacement, Three Buildings, Lewis Clark State College, Lewiston, Idaho | Hobson Fabricating | $254,000 | 1. $8,200 | |
| Mike's Heating & Air Conditioning | $271,729 | 1. $12,271 | ||||
| RM Mechanical | $281,700 | 1. $11,700 | ||||
| Guardian Heating & Air Conditioning | $294,742 | 1. $8,900 | ||||
| 09-18-08 | 08229 | Renovate General Classrooms, Idaho State University, Pocatello, Idaho | Bailey Construction *NON-RESPONSIVE* |
|||
| Vern Clark & Sons Construction | $189,800 | 1. $112,000 2. $84,400 |
||||
| DeWall Construction | $200,200 | 1. $79,300 2. $61,900 |
||||
| DL Beck, Inc. | $183,900 | 1. $88,193 2. $85,636 |
||||
| Harris, Inc. | $204,500 | 1. $96,000 2. $92,000 |
||||
| Barry Hayes Construction | $193,545 | 1. $78,829 2. $113,820 |
||||
| J & S Construction | $206,900 | 1. $105,900 2. $109,800 |
||||
| Rivers West Construction | $203,000 | 1. $98,900 2. $78,000 |
||||
| Shook Construction | $177,922 | 1. $99,899 2. $91,328 |
||||
| 09-10-08 | 05240 REBID | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 23 |
Wheeler Electric | $588,378 | 1. $8,681 2. $11,871 |
|
| Anderson & Wood | $557,000 | 1. $17,430 2. $12,450 |
||||
| Argus Electric | $879,962 | 1. $25,768.79 2. $44,043.09 |
||||
| Portenuf Electric | $545,000 | 1. $10,260 2. $13,500 |
||||
| 09-10-08 | 05240 REBID | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 24 |
Systems Tech | $31,304 | 1. $435 2. $705 |
|
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 1 |
A-Core | $132,400 | ||
| Ideal Demolition | $215,000 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 3B |
Herculean Concrete | $52,134 | ||
| EM Construction | $61,237 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 4 |
TMC Masonry | $23,210 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 5B |
Outland Steel | $343,690 | 1. $114,800 | |
| KB Fabricating *NON-RESPONSIVE* |
||||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 6 |
Saxton Bradely | $567,513 | ||
| Scientific Enviromental | $566,100 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 7 |
Hobson | $342,415 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 8 |
NO BIDS RECEIVED | |||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 9 |
Bentley Door Company *NON-RESPONSIVE* |
|||
| Lloyd Lumber Company | $385,750 | |||||
| The Masonry Center *NON-RESPONSIVE* |
||||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 10 |
Crawford Door Company | $19,650 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 11 |
D&A Glass | $370,039 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 12 |
American Wallcover *NON-RESPONSIVE* |
|||
| Benchmark Construction | $2,510,000 | |||||
| Interior Systems, Inc. | $1,365,800 | |||||
| LOMBOC | $1,147,000 | |||||
| Pac West Interiors *NON-RESPONSIVE* |
||||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 13 |
Designer Floors | $31,625 | ||
| Mesa Tile | $29,250 | |||||
| CFI Flooring | $34,782 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 14 |
Designer Floors | $312,640 | 1.-$12,925 2. -$30,550 |
|
| Great Floors | $300,000 | 1. -$30,523 2. -$45,523 |
||||
| CFI Flooring | $322,948 | 1. -$50,907 2. -$59,792 |
||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 15 |
BHM & Associates | $178,830 | 1.N/A | |
| All Colors Painting | $184,094 | 1. $1,714 | ||||
| National Coatings | $198,495 | 1. $3,100 | ||||
| Color Craft Painting | $183,800 | 1. N/A | ||||
| Commercial Painting | $198,698 | 1. $8,160 | ||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 16 |
SBI Contracting | $175,500 | 1. $4,000 | |
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 17 |
R Jorgenson Company | $24,400 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 18 |
Intragrated Interiors | $9,300 | ||
| The Blind Gallery *NON-RESPONSIVE* |
||||||
| Northwest Sales and Distribution | $9,411.70 | |||||
| Commercial Window Coverings | $8,303 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 20 |
Intermountain Design *NON-RESPONSIVE* |
|||
| Saxton Bradley | $64,437 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 21 |
Thyssenkrupt Elevator | $55,920 | ||
| Schindler Elevator | $72,500 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 22 |
Treasure Valley Fire Protection | $233,500 | Western States Fire Protection *NON-RESPONSIVE* |
|
| Shilo Automatic Sprinklers | $251,540 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 23 |
DeBest Plumbing | $942,723 | ||
| RM Mechanical | $870,222 | |||||
| Buss Mechanical | $879,000 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 24 |
Hobson Fabricating | $963,000 | ||
| Ridgeway Industrial | $876,000 | |||||
| YMC, Inc. | $976,056 | |||||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 25 |
Clima-Tech | $165,768 | ||
| 09-09-08 | 07242 | Remodel Building, ISU-Meridian, Phase 2, Idaho State University, Meridian, Idaho Bid Package No. 26 |
Tri-State Electric | $1,513,380 | ||
| Lea Electric | $1,746,313 | |||||
| Benchmark Electric | $1,672,000 | |||||
| Power Plus | $1,639,608 | |||||
| Quality Electric | $1,700,602 | |||||
| Anderson & Wood | $1,789,000 | |||||
| Northwest Electrical | $1,733,171 | |||||
| Doherty Electric | $1,590,000 | |||||
| 09-04-08 | 08605 | Building Renovations, VETB, Division of Veterans Services, Boise, Idaho | Ellsworth Kincaid Construction | $596,000 | 1. $22,300 2. $21,860 3. $57,430 |
|
| R Squared Construction | $628,402 | 1. $31,900 2. $35,400 3. $71,200 |
||||
| Gafford Construction | $595,065 | 1. $31,822 2. $20,141 3. $67,070 |
||||
| Wright Brothers Construction | $594,842 | 1. $31,845 2. $15,435 3. $85,673 |
||||
| Alpine Construction | $681,374 | 1. $32,356 2. $30,132 3. $75,531 |
||||
| 09-03-08 | 08298 | Pioneer Village, Lewis & Clark Discovery Trail, Idaho State Historical Society, Boise, Idaho | Panorama Construction | $148,027 | 1. $26,524 2. $3,240 3. $34,864 |
|
| Paul Construction | $176,000 | 1. $21,700 2. $9,100 3. $47,600 |
||||
| Wright Brothers Construction | $194,420 | 1. $13,211 2. $9,231 3. $36,844 |
||||
| Golis Construction | $134,400 | 1. $9,800 2. $7,100 3. $40,700 |
09-05-08 | |||
| 09-03-08 | 08352 | Replace HVAC System, Human Development Center, Department of Health and Welfare, Pocatello, Idaho | ATS | $245,325 | 1. $6,700 2. $27,500 3. $28,500 4. $70,200 |
|
| 08-29-08 | 08212 | Biology Lab Remodel, 2nd Floor, Science & Nursing Bldg., Boise State University, Boise Idaho | Advanced Cable Technologies *NON-RESPONSIVE* |
Scott Hedrick Construction | $198,800 | 1. $50,400 2. $62,700 3. $21,600 |
| Perkins Construction | $172,000 | 1. $52,800 2. $64,800 3. $22,650 |
||||
| Guho, Inc. | $177,825 | 1. $51,000 2. $63,000 3. $22,100 |
||||
| Wright Brothers Construction | $193,926 | 1. $55,222 2. $69,521 3. $25,898 |
||||
| Excelsior Construction | $179,426 | 1. $60,300 2. $65,500 3. $22,500 |
||||
| Alpine Construction | $167,800 | 1. $49,000 2. $63,500 3. $22,000 |
||||
| 08-28-08 | 08402 | Replace Heat Pumps, Phase 2, PTF, SHS, Department of Health and Welfare, Blackfoot, Idaho *ALL BIDS REJECTED* |
B&S Boiler | $723,400 | 1. $37,500 2. $155,400 |
|
| Bingham Mechanical | $667,000 | 1. $13,000 2. $162,000 |
||||
| Lewis Corporation | $663,500 | 1. $16,600 2. $162,150 |
||||
| Rivers West Construction | $712,800 | 1. $35,900 2. $151,200 |
||||
| 08-28-08 | 08607 | Install HVAC Unit, West Side, Admin Offices, VETP, Division of Veterans Services, Pocatello, Idaho | Economy Heating & Refrigeration | $57,000 | Lewis Corporation | $67,150 |
| 08-28-08 | 08361 | Remodel Client Residence, R1/R2, Phase 2, ISSH, Department of Health and Welfare, Nampa, Idaho | CCMG, Inc. | $462,180 | 1. $37,100 2. $143,210 3. $16,600 |
|
| Alpine Construction | $514,696 | 1. $41,000 2. $139,600 3. $19,500 |
||||
| Gafford Construction | $560,968 | 1. $47,500 2. $145,644 3. $29,997 |
||||
| Perkins Construction | $493,042 | 1. $35,953 2. $145,204 3. $11,784 |
||||
| 08-26-08 | 08286 | Compact/Mobile Shelving, Idaho History Center, Idaho State Historical Society, Boise, Idaho | Wright Brothers Construction | $128,243 | 1. -$36,508 2. $80,040 3. -$9,889 4. $1,278 |
|
| Bledsoe Group | $120,056.60 | 1. -$11,206.32 2. $65,905.78 3. -$8,671.86 4. $4,680.00 |
||||
| Gafford Construction | $124,132 | 1. -$12,887 2. $79,558 3. -$9,973 4. $4,025 |
||||
| Ellsworth Kincaid Construction | $116,600 | 1. -$35,130 2. $78,600 3. -$9,515 4. $3,200 |
09-11-08 | |||
| 08-26-08 | 08237 | Consolidated Student Enrollment, Idaho State University, Pocatello, Idaho | Barry Hayes Construction | $273,884 | ||
| DL Beck, Inc. | $281,600 | |||||
| Harris, Inc. | $282,000 | |||||
| MBA General Contractors | $288,600 | |||||
| Vern Clark & Sons Construction | $280,900 | |||||
| Ovard Construction | $289,300 | |||||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 1 |
JB Parsons Company | $437,000 | ||
| Paul Construction | $679,000 | |||||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 2 |
Keller Construction | $572,000 | 1. $150 | |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 3 |
JL England Company | $537,000 | ||
| Daniels Masonry | $608,660 | TMC Construction | $866,281 | |||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 4 |
Steel West | $1,129,900 | ||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 5 |
Snake River | $61,626 | 1. $19,375 2. $9,409 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 6 |
Smith Roofing | $288,438 | ||
| Modern Roofing | $233,000 | |||||
| Robinson Roofing | $285,410 | |||||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 7 |
ASI | $127,000 | 1. $5,000 2. $12,000 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 8 |
Precision | $2,644 | ||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 10 |
NO BIDS RECEIVED | |||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 11 |
Precision | $230,796 | 1. $2,046 2. $2,299 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 12 |
ASI | $309,060 | 1. $17,850 2. $25,110 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 13 |
Soriano Construction | $23,400 | Hicks Brothers Construction | $28,898 |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 14 |
Wall-2-Wall | $49,815 | 1. $3,035 2. $8,710 |
Design Floors | $49,760 | 1. $4,772 2. $11,362 |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 15 |
Wall-2-Wall | $119,300 | 1. $6,250 | |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 16 |
Ed's Painting Contractor | $176,000 | 1. $2,700 2. $3,700 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 17 |
Davis Tile | $70,850 | ||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 18 |
ASI | $45,000 | 1. $5,000 2. $0 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 19 |
Schindler Elevator | $78,350 | Thyssenkrupp Elevator | $63,200 |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 20 |
B&G Plumbing | $198,5000 | 1. $1,500 2. $500 |
Os Construction | $245,860 | 1. $2,500 2. $1,000 |
Bingham Mechanical | $199,000 | 1. $3,000 2. $950 |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 21 |
Gem State Fire Protection *NON-RESPONSIVE* |
3-D Fire Sprinklers | $163,395 | 1. $2,150 2. $2,646 |
Shilo Automatic Sprinklers | $84,797 | 1. $2,400 2. $4,600 |
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 22 |
Lewis Corporation | $610,000 | 1. $4,750 2. $5,450 |
|
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 23 |
NO BIDS RECEIVED | |||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 24 |
NO BIDS RECEIVED | |||
| 08-21-08 | 05240 | Student Recreation Center, Reed Gym, Idaho State University, Pocatello, Idaho Bid Package No. 25 |
Rainmakers | $58,270 | ||
| 08-21-08 | 08033 | Landscaping Upgrade, Headquarters, Department of Agriculture, Boise, Idaho | Knife River | $82,518.91 | 1. $11,345.62 2. $11,929.63 |
|
| C&A Paving | $81,930 | 1. $10,831 2. $12,626 |
09-15-08 | |||
| Boise Excavation *NON-RESPONSIVE* |
||||||
| King Excavation *NON-RESPONSIVE* |
||||||
| Burns Construction | $112,852 | 1. $10,015 2. $15,010 |
||||
| Trico Construction | $71,070 | 1. $11,035 2. $30,193 |
||||
| Gafford Construction | $99,757 | 1. $8,848 2. $12,046 |
||||
| Diamond Contractors | $84,285 | 1. $8,200 2. $13,730 |
||||
| 08-21-08 | 08513 | Running Track, Meridian Campus, Idaho State Police, Meridian Idaho | King Excavation | $140,150 | 1. $76,000 2. $27,190 3. $2,800 |
|
| Diamond Contractors | $69,500 | 1. $73,335 2. $25,750 3. $1,598 |
09-11-08 | |||
| Knife River | $77,188.63 | 1. $77,000 2. $27,092.80 3. $4,000 |
||||
| C&A Paving | $75,000 | 1. $72,500 2. $23,500 3. $1,700 |
||||
| 08-20-08 | 08404 | Repair and Sealcoat, Parking Lot and Roads, State Hospital South, Blackfoot, Idaho | Black Diamond Paving | $61,500 | 1. $24,000 2. $18,900 3. $9,700 | |
| Mickelsen Construction | $71,750 | 1. $41,500 2. $26,750 3. $26,500 | ||||
| Jack Parsons Company | $96,170 | 1. $36,500 2. $33,100 3. $9,300 | ||||
| TMC Contractors | $162,580 | 1. $87,220 2. $69,670 3. $35,070 | ||||
| Klinger Asphalt Maintenance | $67,928 | 1. $24,828 2. $21,258 3. $10,400 | ||||
| 08-14-08 | 08311 | Office Addition, SE Regional Office, Dept. of Fish & Game, Pocatello, Idaho | CCMG, Inc. | $1,100,000 | ||
| DL Beck Construction | $797,500 | |||||
| DeWall Construction | $949,000 | |||||
| Harris Construction | $785,000 | |||||
| MBA General Construction | $797,480 | |||||
| Ovard Construction | $869,500 | |||||
| Vern Clark and Sons Construction | $1,052,000 | |||||
| Wright Brothers Construction | $971,409 | |||||
| 08-14-08 | 08013 | Refurbish Three Elevator Cars, LBJ Building, Department of Administration, Boise, Idaho | Ellsworth Kincaid Construction | $437,650 | 1. $152,504 2. $31,280 3. $15,640 4. $5,773 5. $5,773 6. $5,170 |
|
| Wright Brothers Construction | $464,765 | 1. $163,359 2. $33,157 3. $16,579 4. $6,119 5. $6,119 6. $5,480 |
||||
| Gafford Construction | $427,090 | 1. $141,338 2. $30,738 3. $15,696 4. $5,793 5. $5,793 6. $5,188 |
09-03-08 | |||
| 08-13-08 | 08257 | Demolish Fire Escape Towers, Alumni Residence Center & Continuing Education Building, University of Idaho, Moscow, Idaho | Golis Construction | $134,380 | 1. $37,000 2. $20,000 3. $45,000 |
08-22-08 |
| Reiber Construction | $182,000 | 1. $27,000 2. $47,000 3. $62,000 |
||||
| Kensaston Corporation | $267,300 | 1. $45,790 2. -$4,150 3. $48,000 | ||||
| 08-13-08 | 08231 REBID | Renovate HVAC System, University Place, Idaho State University, Idaho Falls, Idaho | B&S Boiler | $123,139 | 1. $145,727 2. $52,025 |
|
| Rivers West Construction | $158,000 | 1. $154,000 2. $55,000 |
||||
| Thurgood Mechanical | $229,000 | 1. $72,000 2. $42,000 |
||||
| 08-12-08 | 08670 | Replace Lighting Controls, Taco Bell Arena, Boise State University, Boise, Idaho | Quality Electric | $378,537 | 1. $14,637 2. $25,913 |
8-15-2008 |
| Power Plus *NON-RESPONSIVE* |
||||||
| 08-12-08 | 06221 REBID | Exterior ADA Improvements, Idaho State University, Pocatello, Idaho | Brennan Construction | $217,159 | 1. $56,667 | |
| DL Beck | $195,300 | 1. $57,200 | ||||
| Harris Inc | $188,000 | 1. $45,000 | ||||
| Kiggins Concrete | $140,628 | 1. $39,144 | ||||
| Rivers West Construction | $239,000 | 1. $90,000 | ||||
| 08-07-08 | 07334-REBID | Improvements, Orofino RC, Division of Military, Orofino, Idaho | Holcomb Construction | $83,300 | 1. $91,500 | |
| Gen Con | $81,784 | 1. $68,497 | 08-21-08 | |||
| Idaho Stage | $89,066 | 1. $67,407 | ||||
| 08-07-08 | 08032 | Repairs/Modifications, Seed Lab Building, Dept. of Agriculture, Boise, Idaho | The Bledsoe Group | $48,500 | ||
| Alpine Construction | $39,763 | |||||
| Dave's Construction | $28,233 | 08-12-08 | ||||
| Challenger Companies | $42,947 | |||||
| KEPHA Construction | $40,810 | |||||
| Ellsworth Kincaid Construction | $49,200 | |||||
| Wright Brothers | $37,771 | |||||
| Excelsior Construction | $38,500 | |||||
| 08-06-08 | 08061 | Replace Fire Detection Systems, Housing Units, ISCI, Department of Correction, Boise, Idaho | Doherty Electric | $151,000 | 1. $62,500 | 08-15-08 |
| Anderson & Wood Construction *NON-RESPONSIVE |
||||||
| Quality Electric NON-RESPONSIVE |
||||||
| McLean Electric | $203,000 | 1. $78,000 | ||||
| 07-31-08 | 08065 | Replace Sallyport Gates, ICIO, Department of Correction, Orofino, Idaho | Northwest Fence | $208,998 | 08-12-08 | |
| Idaho Stage | $215,000 | |||||
| 07-30-08 | 08651 | Building Infrastructure Upgrades, Morrison Lab, Boise State University, Boise, Idaho | ||||
| Scott Hedrick Construction | $699,900 | 08-19-08 | ||||
| Drake Mechanical | $873,711 | |||||
| Wright Brothers Construction | $762,416 | |||||
| K-J Corporation | $735,000 | |||||
| Luekenga Construction | $715,409 | |||||
| Gafford Construction | $747,257 | |||||
| Kepha Construction | $716,000 | |||||
| 07-29-08 | 08650 | Physics Lab Remodel, Rm 309, Multi-Purpose Classroom Bldg, Boise State University, Boise, Idaho | Luekenga Construction *NON-RESPONSIVE* |
|||
| Alpine Construction | $510,000 | 1. $27,900 2. $11,300 |
07-31-08 | |||
| CCMG, Inc. | $578,460 | 1. $37,185 2. $11,270 |
||||
| Kepha Construction | $534,800 | 1. $43,275 2. $10,543 |
||||
| R Squared Construction | $541,459 | 1. $26,400 2. $10,900 |
||||
| Excelsior Construction | $520,900 | 1. $25,300 2. $10,400 |
||||
| Scott Hedrick Construction | $525,900 | 1. $41,907 2. $10,210 |
||||
| Guho Construction | $564,900 | 1. $47,280 2. $10,950 |
||||
| Wright Brothers Construction | $542,486 | 1. $27,023 2. $11,858 |
||||
| 07-29-08 | 08281 | Repair Roadway and Parking Lot, Old Pen Administration Building, Idaho State Historical Society, Boise, Idaho | Clearwater Operations | $115,631.03 | 1. $20,014.70 | |
| Paul Construction | $97,900 | 1. $31,000 | ||||
| Diamond Contractors | $79,604.40 | 1. $23,701.30 | ||||
| Warner Construction | $79,721.25 | 1. $19,500 | ||||
| Superior Construction & Excavating *NON-RESPONSIVE* |
||||||
| Tuffy Excavating | $81,434.22 | 1. $22,910.66 | ||||
| Knife River | $106,586.80 | 1. $25,485.66 | ||||
| WF Construction & Sales | $105,268 | 1. $35,397 | ||||
| C&A Paving | $78,475 | 1. $20,350 | 08-06-08 | |||
| 07-24-08 | 08667 | Electric Outdoor Sign, Holt Arena, Idaho State University, Pocatello, Idaho | Blaze Sign & Graphic Design *NON-RESPONSIVE* |
|||
| Lytle Signs, Inc. | $220,800.00 | 2. $15,665 3. $35,553 4. $4,530 5. $12,000 6. NO BID |
08-22-08 | |||
| Paktronics | $340,300.00 | 2. $21,500 3. $36,440 4. $8,050 5. NO BID 6. NO BID |
||||
| Rivers West Construction | $238,800.00 | 2. $16,000 3. $36,000 4. $4,900 5. $12,500 6. NO BID |
||||
| Vern Clark and Sons Construction | $263,000.00 | 2. $19,500 3. $36,000 4. $3,800 5. $15,700 6. NO BID |
||||
| Young Electric | $229,843.00 | 2. $15,871 3. $33,263 4. $2,153 5. $13,434 6. NO BID |
||||
| 07-24-08 | 08228 | HVAC Renovation, Health and Nutrition Science Department, Reed Gym, Idaho State University, Pocatello, Idaho |
B&S Boiler | $265,475 | 1. $42,500 | |
| Rivers West Construction | $256,000 | 1. $32,000 | ||||
| 07-23-08 | 08570 | Replace HVAC, District 4 Headquarters, Idaho Transportation Department, Shoshone, Idaho | Gafford Construction | $196,335 | ||
| Hobson Fabricating | $199,990 | |||||
| Terry's Heatinng & Air Conditioning | $161,180 | 08-04-08 | ||||
| Sawtooth Sheet Metal | $182,238 | |||||
| Alpine Construction | $198,800 | |||||
| 07-22-08 | 09190 | Replace Upper Roof, Albertsons Library, Boise State University, Boise, Idaho | Upson Company | $201,300 | 1. $63,930 | 07-29-08 |
| Modern Roofing | $194,694 | 1. $157,252 | ||||
| Pro Tech Roofing | $164,684 | 1. $111,065 | ||||
| 07-18-08 | 08224 | Replace Broken Concrete Steps & Sidewalks, Idaho State University, Pocatello, Idaho | Vern Clark and Sons Construction | $249,837 | 1. $19,400 2. $17,300 |
07-24-08 |
| Paul Construction | $262,000 | 1. $35,000 2. $8,100 |
||||
| Kiggens Concrete *NON-RESPONSIVE* |
||||||
| 07-16-08 | 08063 | Replace Fire Detection Systems, McKellway and Givens Halls, ICIO, Department of Correction, Orofino, Idaho | Quality Electric | $163,022 | 1. $61,573 | 07-24-08 |
| 4-J Electric | $301,388 | 1. $148,988 | ||||
| 07-15-08 | 08262 | Re-Roof, McCall Field Campus, CNR, University of Idaho, McCall, Idaho | Pro Tech Roofing | $118,908 | 1. $137,255 2. $82,357 3. $54,908 4. $65,852 |
|
| Upson Company | $135,550 | 1. $146,575 2. $87,945 3. $58,630 4. $106,340 |
||||
| Hobson Fabricating | $103,400 | 1. $159,400 2. $98,000 3. $67,400 4. $53,500 |
||||
| Z Steel | $55,915 | 1. $71,038 2. $43,685 3. $29,407 4. $20,615 |
For more information regarding this page, please email Construction Management or call 208.332.1900.