Idaho's Governor has issued an Executive Order 2009-10 that requires contracts for services performed in the State of Idaho are with businesses that employ individuals who are eligible under Federal and State law to work in the United States. The Division of Public Works is developing procedures to assure that this requirement is met.
| Submission Date |
Project Number |
Project Name |
| 05-15-12 | 12214 | Replace Horizontal Expansion Joints, Parking Garages, Boise State University, Boise, Idaho |
| 05-17-12 | 12331 | Re-Roof and Mechanical Upgrade, Readiness Center, Division of Military, Pocatello, Idaho Addendum One issued May 8, 2012 |
| 05-24-12 | 12229 | Replace Windows, 1st Floor, Industrial Crafts Building, Idaho State University, Pocatello, Idaho |
| 05-29-12 | 12092 | Sidewalks and Fire Lanes, College of Southern Idaho, Twin Falls, Idaho |
| 05-30-12 | 10195 | Repairs, Friendship Bridge, Boise State University, Boise, Idaho |
| 05-31-12 | 08264 Part II |
Life Safety, Buchanan Engineering Building, University of Idaho, Moscow, Idaho |
| 06-05-12 | 12531 | Safety Upgrades, Holding Rooms, Juvenile Correction Center-Nampa, Division of Juvenile Correction, Nampa, Idaho |
| 06-07-12 | 09251 Part II |
Steam Tunnel Improvements, University Avenue & Line Street, University of Idaho, Moscow, Idaho |
| Submission Date |
Project Number |
Project |
| 04-17-12 | 12222 | Remodel Basement, College of Education Building, Idaho State
University, Pocatello, Idaho |
| Submission Date |
Project Number |
Project Name |
| 05-15-12 | 12541 | Kiddie Pool, Lava Hot Springs, Idaho Department of Parks and Recreation, Lava Hot Springs, Idaho ATTACHMENTS ADDENDUM ONE |
Archived Bid Results: 2011, 2010, 2009, 2008, 2007, 2006, 2005, 2004, and 2003
| Submission Date |
Project Number |
Project Name |
Contractor |
Base Bid |
Alternates |
Awarded |
| 05-15-12 | 12214 | Replace Horizontal Expansion Joints, Parking Garages, Boise State University, Boise, Idaho | ||||
| Watson Associates | $111,348 |
Unit Price 1. $6,292 Unit Price 2. $1,080 Unit Price 3. $735 1. $78,895 |
||||
| Contech Services, Inc. | $132,728 |
Unit Price 1. $14,330 Unit Price 2. $3,240 Unit Price 3. $3,120 1. $120,440 |
||||
| Hellmann Construction Company, Inc. | $104,000 |
Unit Price 1. $12,000 Unit Price 2. $1,300 Unit Price 3. $3,000 1. $92,000 |
||||
| 05-15-12 | 12330 | Renovate Readiness Center, Division of Military, Preston, Idaho | Ascent Construction | $1,205,000 |
1. $18,700 2. $83,500 3. $35,200 |
|
| Ascent Constructors | $1,136,508 |
1. $14,752 2. $89,373 3. $39,233 |
||||
| Barry Hayes Construction | $997,847 |
1. $10,447 2. $47,718 3. $33,589 |
||||
| Century Contractors | $989,686 |
1. $14,326 2. $54,643 3. $35,457 |
||||
| CK Construction | $1,159,000 |
1. $15,400 2. $73,500 3. $40,500 |
||||
| Raymond Construction | $1,056,985 |
1. $9,100 2. $56,825 3. $35,000 |
||||
| Starr Corporation | $985,000 |
1. $10,400 2. $84,000 3. $36,500 |
||||
| 05-03-12 | 12006 | Renovate Infrastructure, Capitol Annex, Department of Administration, Boise, Idaho | Guho Corp. | $621,000 |
1. $14,837 2. $20,886 3. $35,750 |
|
| Perkins Construction, Inc. | $1,052,000 |
1. $20,800 2. $20,400 3. $37,500 |
||||
| Andersen Construction Company | $1,175,000 |
1. $41,000 2. $23,000 3. $57,000 |
||||
| Northcon, Inc. | $1,170,281.66 |
1. $15,237.71 2. $22,185.90 3. $54,321.58 |
||||
| 05-03-12 | 12130 | HVAC Replacement and Upgrade, Ph. I, Sessions Building No. 1, Eastern Idaho Technical College, Idaho Falls, Idaho | Barry Hayes Construction Co. | $193,628 |
1. $25,295 2. $868 |
|
| Hobson Fabricating | $200,000 |
1. $39,000 2. $1,084 |
||||
| Lewis | $219,200 |
1. $32,800 2. $950 |
||||
| Rivers West Construction | $193,000 |
1. $25,200 2. $1,000 |
||||
| 05-03-12 | 12230 | Mechanical Systems Upgrade, Ph. 5, Continuing Higher Education Building, University Place, Idaho State University, Idaho Falls, Idaho | B&S Boiler | $166,240 |
1. $12,250 2. $10,308 |
|
| Hobson Fabricating | $154,000 |
1. $18,000 2. $3,000 |
||||
| Lewis | $139,300 |
1. $23,800 2. $10,000 |
||||
| 05-03-12 | 11227 | HVAC Replacement & Upgrades, Tingey Building, Uniersity Place, Idaho State University, Idaho Falls, Idaho | Eagle Rock Timber | $151,423 |
1. $53,070 2. $22,030 3. $3,060 |
|
| Hobson Fabricating | $129,000 |
1. $54,000 2. $20,685 3. $8,000 |
||||
| Lewis | $125,000 |
1. $41,000 2. $24,500 3. $2,625 |
||||
| Rivers West Construction | $139,950 |
1. $40,820 2. $21,300 3. $3,150 |
||||
| 05-01-12 | 12252 | HVAC System Improvements, Administration Building, University of Idaho, Moscow, Idaho | Kenaston Corporation | $795,000 |
1. $53,000 2. $160,000 |
|
| Ginno Construction | $566,000 |
1. $71,000 2. $125,000 |
||||
| 04-30-12 | 11093 | Parking Lots, Evergreen Building C-Wing, Canyon Building, and Early Childhood Center, College of Southern Idaho, Twin Falls, Idaho | Stutzman, Inc. | $224,360 |
1. $38,220 2. $93,993 |
|
| Kloepfer, Inc. | $253,786 |
1. $41,510 2. $80,330 |
||||
| Granite Excavation, Inc. | $173,395 |
1. $25,741 2. $56,092 |
||||
| Staker & Parson, dba Idaho Sand & Gravel | $230,457 |
1. $37,346 2. $88,275 |
||||
| Lakeside Industries, Inc. dba Valley Paving NON-RESPONSIVE |
||||||
| 04-25-12 | 12251 | Tower Structural Repairs, Memorial Gym, University of Idaho, Moscow, Idaho | ||||
| Talisman Construction Services, Inc. | $388,887 |
|||||
| Golis Construction | $199,000 |
|||||
| Brown Contracting and Development NON-RESPONSIVE |
||||||
| RMR Construction Inc. | $404,950 |
|||||
| Kenaston Corporation | $459,230 |
|||||
| T.W. Clark | $298,800 |
|||||
| Ginno Construction | $305,000 |
|||||
| 04-24-12 | 12501 | Office Expansion, Supervisory Area Office, Lake Pend Oreille, Idaho Department of Lands, Sandpoint, Idaho | ||||
| IDAGON Homes, LLC | $143,875 |
1. $17,210 2. $12,650 |
||||
| James Construction, LLC | $147,765 |
1. $19,500 2. $18,750 |
||||
| Smalls Construction | $126,053 |
1. $16,727 2. $13,094 |
||||
| B.F. Builder, Inc. | $118,500 |
1. $20,000 2. $16,000 |
||||
| Ginno Construction | $126,800 |
1. $14,750 2. $14,400 |
||||
| Dardan Ent. | $129,953 |
1. $15,982 2. $12,628 |
||||
| 04-24-12 | 12210 | Repair Masonry and Replace Roofs, University Heights Apartments, Boise State University, Boise, Idaho | ||||
| Talisman Construction Services, Inc. | $335,516 |
1. $158,858 2. $9,980 3. $46,957 |
||||
| Gafford Construction | $570,104 |
1. $143,547 2. $67,630 3. $21,875 |
||||
| Commercial Remodeling | $420,757 |
1. $143,375 2. $64,367 3. $22,869 |
||||
| Hellmann Construction Company, Inc. | $373,601 |
1. $153,383 2. $21,000 3. $31,930 |
||||
| Guho Corporation NON-RESPONSIVE |
||||||
| Alpine Construction, Inc. |
$492,000 |
1. $154,700 2. $44,400 3. $43,350 |
||||
| 04-17-12 | 12401 | Boiler Blow Down Tanks, Administration And Utility Buildings, State Hospital South, Idaho Department of Health & Welfare, Blackfoot, Idaho | Matthews Plumbing | $32,500 | ||
| B&S Boiler | $34,700 | |||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho
BP 3 - Landscaping, Fencing and Site Furnishing | ||||
| Sterling Landscape | $195,188 |
2. $65,184 | ||||
| Franz Witte | $142,947 |
2. $99,750 | ||||
| LawnCo | $150,395 |
2. $68,657 | ||||
| Clearwater Landscape NON-RESPONSIVE |
||||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 4 - Masonry and Precast Concrete |
||||
| ML Masonry | $880,000 |
1. $68,000 | ||||
| TMC | $877,530 |
1. $0 | ||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 5 - Steel Fabrication and Erection |
||||
| Mountain Steel | $1,380,680 |
1. $130,740 | ||||
| Rule Steel | $1,575,000 |
1. $139,135 | ||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 6 - Architectural Millwork |
||||
| Idaho Custom Woodworks | $1,179,617 |
|||||
| Johnson Brothers | $1,200,000 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 7 - Metal Wall Panels |
||||
| Upson | $689,800 |
|||||
| Modern Roofing | $489,497 |
|||||
| Southam & Associates NON-RESPONSIVE |
||||||
| Hobson Fabricating | $460,000 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 8 - Roofing |
||||
| Hobson Fabricating | $269,310 |
1. ($70,800) | ||||
| Modern Roofing | $346,540 |
1. ($83,800) | ||||
| ProTech | $374,753 |
1. ($89,966) | ||||
| Upson | $315,000 |
1. ($72,900) | ||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 9 - Doors, Frames, Coiling Doors, and Hardware |
||||
| Architectural Building Supply | $168,200 |
|||||
| Masonry Center | $174,678 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 10 - Aluminum Storefronts, Curtain Wall, and Glazing |
||||
| Custom Glass | $725,500 |
|||||
| Architectural Glass & Glazing | $795,950 |
|||||
| D & A | $721,179 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 11 - Gypsum Board Assemblies |
||||
| PS&G | $1,612,000 |
4. $97,000 | ||||
| Summit | $1,237,900 |
4. $61,800 | ||||
| Lomboc | $1,598,000 |
4. $91,600 | ||||
| Interior Systems | $1,222,340 |
4. $82,600 | ||||
| Northwest Interiors NON-RESPONSIVE |
||||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 12 - Tiling and Floor Coverings |
||||
| Designer Floors | $628,650 |
3. $0 | ||||
| Wall2Wall | $705,820 |
3. ($4,000) | ||||
| Dillabaughs | $670,000 |
3. ($4,200) | ||||
| Great Floors | $704,927 |
3. ($4,100) | ||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 13 - Painting & Wallcovering |
||||
| Color Craft | $158,900 |
1. $1,900 | ||||
| National Coatings NON-RESPONSIVE |
||||||
| BHM | $133,776 |
4. ($1,255) | ||||
| Simply Painting | $155,000 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 14 - Specialties, Equipment, and Furnishings |
||||
| Intermountain Design | $225,686 |
|||||
| SBI | $239,800 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 15 - Operable Partitions |
||||
| Alder Sales | $493,473 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 16 - Elevators |
||||
| Schindler | $159,700 |
|||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 17 - Fire Suppression, Plumbing, HVAC, and Hydrotherapy Equipment |
||||
| Buss Mechanical | $2,488,159 |
1. ($18,850) 3. $430,000 |
||||
| Lacey Mechcanil | $3,180,600 |
1. ($24,200) 3. $373,600 |
||||
| Hobson Fabricating | $2,899,000 |
1. ($18,185) 3. $64,000 |
||||
| DeBest | $3,122,500 |
1. ($18,185) 3. $399,000 |
||||
| RM Mechanical | $2,680,000 |
1. ($16,900) 3. $359,600 |
||||
| 04-12-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 18 - Electrical Systems |
||||
| Quality Electric | $1,600,000 |
3. $3,000 | ||||
| Tri-State Electric | $1,499,995 |
3. $4,550 | ||||
| Anderson Wood | $1,986,000 |
3. $3,450 | 04-12-12 | 11193 | Door Access/Security Systems, Ph. III, Boise State University, Boise, Idaho | |
| Integrated Security Resources, Inc. | $105,500 |
1. $7,800 2. $19,400 |
||||
| Yamas Controls NON-RESPONSIVE |
||||||
| Gafford Construction | $98,204 |
1. $7,481 2. $17,939 |
||||
| Commerical Remodeling | $94,800 |
1. $7,900 2. $18,900 |
||||
| Alpine Construction | $113,100 |
1. $12,200 2. 26,420 |
||||
| 04-05-12 | 12232 | Renovate Room 224, College of Education Building, Idaho State University, Pocatello, Idaho | Barry Hayes Construction | $77,782 |
||
| DeWall Construction Co. | $60,800 |
|||||
| J&S Construction Company | $55,380 |
05-14-12 | ||||
| Harris, Inc. | $75,000 |
|||||
| Rivers West Construction | $64,800 |
|||||
| Vern Clark & Sons Const. Co., Inc. | $62,300 |
|||||
| 04-04-12 | 12151 | Replace/Upgrade HVAC Systems, Three Buildings, Lewis Clark State College, Lewiston, Idaho | ||||
| Idaho Stage, LLC | $400,000 |
1. $18,000 2. $21,000 |
||||
| Hobson Fabricating Corp. NON-RESPONSIVE |
||||||
| TYKO Mechanical, LLC | $329,000 |
1. $15,000 2. $20,500 |
||||
| 03-28-12 | 12234 | ADA Upgrade Elevator, Turner Hall, Idaho State University, Pocatello, Idaho | ||||
| Harris, Inc. | $525,000 |
1. $37,000 | 05-16-12 | |||
| J & S Construction | $599,700 |
1. $38,000 | ||||
| Rivers West Construction | $555,700 |
1. $35,300 | ||||
| Starr Corporation NON-RESPONSIVE |
||||||
| Vern Clark & Sons Construction | $563,700 |
1. 37,800 | ||||
| 03-22-12 | 12154 | ADA Upgrades, Center for Arts and History, Lewis Clark State College, Lewiston, Idaho | ||||
| Quality Contractors | $259,200 |
1. $19,900 2. $7,400 |
||||
| Idaho Stage | $227,000 |
1. $14,000 2. $6,000 |
4-24-12 | |||
| Kenaston Corporation | $242,000 |
1. $16,000 2. $2,461 |
||||
| Norcon | $262,758 |
1. $10,673 2. $6,911 |
||||
| Holcomb General Contracting, Inc. | $248,400 |
1. $17,500 2. $6,600 |
||||
| Wellen's Farwell | $236,775 |
1. $16,800 2. $4,200 |
||||
| 03-21-12 | 11208 | Geothermal Building Conversion, Five Buildings, Boise State University, Boise, Idaho | ||||
| RM Mechanical, Inc. | $449,500 |
1. $12,825 2. $33,660 |
||||
| DeBest, Inc. | $561,500 |
1. $10,535 2. $40,000 |
||||
| Western States Geothermal NON-RESPONSIVE |
||||||
| Lacy Mechanical, Inc. | $439,000 |
1. $14,900 2. $33,500 |
05-08-12 | |||
| Paige Mechanical Group, Inc. | $535,000 |
1. $22,950 2. $29,580 |
||||
| 03-21-12 | 11207 | Geothermal Building Conversion, Morrison Center, Boise State University, Boise, Idaho | ||||
| Buss Mechanical Services, Inc. | $182,000 |
|||||
| RM Mechanical, Inc. | $154,500 |
|||||
| DeBest, Inc. | $199,550 |
|||||
| Cascade Enterprises, Inc. | $236,000 |
|||||
| Paige Mechanical Group, Inc. | $164,952 |
|||||
| Lacy Mechanical, Inc. | $166,100 |
|||||
| 03-20-12 | 12235 | HVAC Upgrades, Garrison Hall and Albion Hall, Idaho State University, Pocatello, Idaho | ||||
| B & G Plumbing | $124,900 |
1. $6,400 2. $1,800 3. $6,300 |
||||
| Hobson Fabricating Corp. | $102,587 |
1. $6,000 2. $1,480 3. $6,615 |
04-20-12 | |||
| Bingham Mechanical | $137,800 |
1. $7,400 2. $1,500 3. $8,000 |
||||
| Upstream Plumbing | $120,888 |
1. $6,856 2. $1,700 3. $7,124 |
||||
| Lewis Corporation | $129,700 |
1. $7,700 2. $1,510 3. $8,350 |
||||
| 03-20-12 | 12360 | Replace Building Control System, Campus Wide, Southwest Idaho Treatment Center (SWITC), Department of Health & Welfare, Nampa, Idaho | ||||
| ATS Inland Northwest, LLC | $92,000 |
1. $41,000 2. $12,000 3. $21,000 |
04-16-12 | |||
| 03-15-12 | 12620 REBID |
Compact Mobile Shelving, Phase 3, Idaho History Center, Idaho State Historical Society, Boise, Idaho | ||||
| Hobson Fabricating Corp. | $576,800 |
1. $11,500 | ||||
| Spacesaver Intermountain, LLC | $700,861 |
1. $38,560 | ||||
| 03-15-12 | 11380 REBID |
Door Security System, State Hospital North, Department of Health and Welfare, Orofino, Idaho | ||||
| White Cloud Communications, Inc. | $85,397.22 |
1. $1,043.12 2. $5,522.12 3. $4,122 |
||||
| Brown Contracting & Developement | $107,000 |
1. $2,100 2. $17,000 3. $4,000 |
||||
| Quality Contractors, LLC | $122,171 |
1. $3,214 2. $10,500 3. $7,533 |
||||
| Kenaston Corporation | $140,352 |
1. $2,060 2. $19,732 3. $6,878 |
||||
| 03-14-12 | 12402 |
Upgrade Data and Telecommunication Cabling and Infrastructure, Psychiatric Treatment Facility, State Hospital South (SHS), Division of Health & Welfare, Blackfoot, Idaho | ||||
| Arco Electric | $73,600 |
1. $26,000 2. $7,600 3. $38,700 4. $29,900 |
||||
| Mountain West Electric | $87,200 |
1. $14,700 2. $9,200 3. $35,400 4. $35,500 |
Portneuf Electric | $95,500 |
1. $19,500 2. $6,700 3. $25,500 4. $40,700 |
Wheeler Electric | $85,675 |
1. $9,860 2. $6,510 3. $37,445 4. $32,085 |
04-24-12 |
| 03-08-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 1 - Sitework, Asphalt Paving, Site Demolition |
||||
| IRA-MAC | $590,000 |
2. $8,000 Unit Price: $25 |
||||
| Capital Paving Company NON-RESPONSIVE |
CNA | $643,078 |
2. $12,500 Unit Price: $26 |
|||
| Lurre Construction Inc. | $488,000 |
2. $12,000 Unit Price: $35 |
||||
| Alta Construction Inc. | $434,000 |
2. $15,000 Unit Price: $21 |
||||
| WF Construction | $425,258 |
2. $10,400 Unit Price: $40 |
04-11-12 | |||
| Warner Construction, Inc. | $598,000 |
2. $20,000 Unit Price: $25 |
||||
| Sawtooth Construction | $621,315 |
2. $21,300 Unit Price: $32 |
||||
| Power Plus | $578,660 |
2. $13,900 Unit Price: $32 |
||||
| 03-08-12 | 11206 | Athletic Football Complex, Boise State University, Boise, Idaho BP 2 - Concrete |
||||
| CPC | $1,842,000 |
1. $153,000 | ||||
| Herculean Concrete Systems | $1,975,719 |
1. $289,000 | McAlvain Construction, Inc. | $2,080,276 |
1. $183,724 | |
| EM Construction Co. | $1,648,517 |
1. $158,513 | 04-11-12 | |||
| 03-01-12 | 09543 REBID |
Security Upgrades, Building and Grounds, Headquarters, Idaho Department of Parks and Recreation, Boise, Idaho | ||||
| Hellmann Construction Company | $97,367 |
1. $8,581 2. $7,054 3. $4,533 |
||||
| Gafford Construction Inc. | $64,076 |
1. $6,233 2. $4,198 3. $3,919 |
White Cloud Communications | $70,252.44 |
1. $9,000 2. $4,122.22 3. $2,912.22 |
Commercial Remodeling, LLC | $63,824 |
1. $6,842 2. $4,587 3. $4,282 |
| 02-29-12 | 10193 | Campus Lighting & Infrastructure Improvements, Boise State University, Boise, Idaho | ||||
| Alpine Construction, Inc. | $175,000 |
1. $7,700 2. $1,200 3. $24,000 |
||||
| 02-22-12 | 11063 | Replace Standby Generator, McKelway Hall & A-Block, ICIO, Idaho Department of Correction, Orofino, Idaho | ||||
| Mike's Heating & Air Conditioning | $257,522 |
1. $138,061 | ||||
| Twin City Electricians, Inc. | $208,180 |
1. $132,000 | Shannon Industrial Contractors, Inc. | $205,000 |
1. $93,000 | 04-13-12 | Quality Electric | $233,270 |
1. $110,359 |
| 02-21-12 | 12620 | Compact Mobile Shelving, Phase 3, Idaho History Center, Idaho State Historical Society, Boise, Idaho *WILL BE REBID* |
||||
| Spacesaver Intermountain, LLC NON-RESPONSIVE |
||||||
| 02-14-12 | 11229 | Replace Old Main Lines, Campus Irrigation System, Idaho State University, Pocatello, Idaho | ||||
| Barry Hayes Construction NON-RESPONSIVE |
||||||
| DeWall Construction | $272,900 |
1. $34,800 2. $19,600 3. $87,900 |
||||
| Harris, Inc. | $257,000 |
1. $37,000 2. $24,000 3. $93,000 |
||||
| Rivers West Construction | $272,200 |
1. $29,400 2. $19,600 3. $94,000 |
||||
| Vern Clark & Sons Construction | $213,600 |
1. $29,300 2. $17,000 3. $88,000 |
03-26-12 | |||
| Seasons West | $322,416 |
1. $31,110 2. $23,245 3. $90,984 |
||||
| MD Landscape NON-RESPONSIVE |
||||||
| 02-09-12 | 11171 | Mechanical Upgrades, Various Buildings, North Idaho College, Coeur d'Alene, Idaho | ||||
| Air Tech Mechanical | $827,500 |
1. $37,900 2. $79,260 |
||||
| R.M. Mechanical | $763,219 |
1. $41,000 2. $84,000 |
||||
| Ginno Construction | $665,600 |
1. $38,200 2. $79,900 |
||||
| 02-03-12 | 12400 | Remodel Patient Bedrooms, Wings B&D, Phase 2, PTF, State Hospital South, Blackfoot, Idaho | ||||
| Barry Hayes Construction | $128,889 |
|||||
| CK Construction NON-RESPONSIVE |
||||||
| Century Contractors | $137,487 |
|||||
| Cruz Brothers Construction | $145,889 |
|||||
| DeWall Construction | $129,800 |
|||||
| Harris, Inc. | $121,500 |
04-16-12 | ||||
| J&S Construction | $123,300 |
|||||
| Vern Clark & Sons Construction | $157,300 |
|||||
| Rivers West Construction | $146,000 |
|||||
| Harper NON-RESPONSIVE |
||||||
| 3-D Decker Construction Inc. | $123,887 |
|||||
| 01-24-12 | 11302 | Repair & Upgrade Geothermal, Industrial Arts Building (IAB), Department of Labor, Boise, Idaho | ||||
| Buss Mechanical Services, Inc. | $843,000 |
1. $174,343 2. $15,000 3. $47,000 |
||||
| Western States Geothermal | $841,701 |
1. $78,849 2. $15,950 3. $62,000 |
||||
| YMC, Inc. | $1,235,395 |
1. $191,250 2. $18,785 3. $58,565 |
||||
| Paige Mechanical Group, Inc. | $729,000 |
1. $121,600 2. $14,500 3. $49,900 |
||||
| DeBest, Inc. | $1,015,600 |
1. $138,000 2. $29,900 3. $52,000 |
||||
| Lacy Mechanical, Inc. | $754,300 |
1. $137,100 2. $12,037 3. $49,200 |
||||
| RM Mechanical, Inc | $970,530 |
1. $136,000 2. $16,000 3. $51,400 |
||||
| Cascade Enterprises, Inc. | $661,350 |
1. $112,060 2. $10,260 3. $43,255 |
03-09-12 | |||
| 01-19-12 | 11202 | TECenter Renovation, Boise State University, Nampa, Idaho | ||||
| Golis Construction, Inc. | $687,378 |
1. $3,680 2. $8,000 3. $55,800 4. $23,750 5. $15,100 |
||||
| Andersen Construction Company | $654,500 |
1. $12,000 2. $2,800 3. $45,700 4. $24,000 5. $14,000 |
||||
| Dave Allen Construction | $629,000 |
1. $12,208 2. $6,797 3. $48,096 4. $22,085 5. $14,058 |
02-28-12 | |||
| Ellsworth Kincaid Construction, Inc. | $651,600 |
1. $3,760 2. $9,210 3. $48,150 4. $23,700 5. $14,520 |
||||
| Contractors Northwest, Inc. | $677,400 |
1. $3,500 2. $9,000 3. $56,600 4. $23,000 5. $14,700 |
||||
| Perkins Construction Inc. | $638,000 |
1. $5,670 2. $6,700 3. $51,100 4. $26,200 5. $13,900 |
||||
| Gafford Construction Inc. | $667,934 |
1. $3,780 2. $10,137 3. $51,597 4. $26,549 5. $14,598 |
||||
| Commerical Remodeling, LLC | $708,020 |
1. $14,542 2. $7,210 3. $67,235 4. $23,500 5. $15,139 |
||||
| Steed Construction, Inc. | $680,000 |
1. $3,640 2. $6,603 3. $60,496 4. $28,225 5. $12,631 |
||||
| Alpine Construction, Inc. | $707,000 |
1. $9,500 2. $7,900 3. $61,000 4. $29,500 5. $13,800 |